With the rapid development of the economy, the demand for small transformers is increasing, which also increases the demand for automatic winding machines for transformers. The requirements are becoming increasingly strict, and the operation process is relatively chaotic. However, as long as the winding machine is fully automatic, the fundamental general process is similar. The manufacturer of the automatic winding machine takes us to take a look at them.
1. Check before starting up. Before starting up, it is necessary to roughly inspect the automatic winding machine to ensure that no major problems are found and complete the 5-second operation.
2. Turn on the heat engine. After turning on the power, you need to perform a warm-up operation. But the winding machine enters the normal state of powered ventilation, and the next step will be taken after all parts are running normally.
3. Set parameters, find the corresponding material specifications and models based on recent processing requirements, and set the corresponding parameters in the winding machine.
4. Debugging: After setting the parameters, it does not mean that it can be directly produced. Debugging is also required to ensure the harmonious operation of all parameters and components of the winding machine, and the quality of the produced products meets the standards.
5. For small-scale production, if it is a transformer model that has not been produced before, it is necessary to conduct small-scale trial production first to ensure that there are no major problems.
6. Formal production. If there are no small batches, they will be produced in large quantities. At the beginning, engineers and technicians need to be on duty to ensure good operation before handing over to operators!